North Arrow Minerals

Lac des Gras West

OVERVIEW

Aurora Geosciences has worked with North Arrow for a number of years on many projects collecting, processing, and interpreting geophysical data on a their exploration projects.

The Lac de Gras Project is located in the Lac de Gras kimberlite field, close to two of the world’s richest diamond mines: Diavik and Ekati. North Arrow considers the area to have significant exploration potential for the discovery of new diamondiferous kimberlites.  Exploration of the project is conducted under joint venture agreement with Dominion Diamond Corporation under which Dominion owns ~61% interest in the project.  Dominion is the most important diamond company in the NWT, owning an interest in both the Diavik (40%) and Ekati (80%) mines.

Previous work in the project area has included airborne surveys, till sampling, ground geophysics and limited diamond drilling. Untested geophysical anomalies and unexplained geochemical anomalies remain, but the glacial history of the project area south of Lac de Gras is considered to be complex, having been exposed to multiple glacial events.

In 2013, Dominion earned their interest in the Project by conducting an extensive, $5 million program of reverse circulation overburden drilling intended to fully evaluate basal tills for kimberlite indicator minerals.  The program utilized a helicopter portable reverse circulation drill capable of sampling a complete till column to reach basal till not accessed by previous surficial till sampling. A total of 757 overburden reverse circulation drill holes (1,704 samples) tested the basal tills of the property for kimberlite indicator minerals (KIMs).  The 2013 exploration program was managed by Aurora Geosciences Ltd. of Yellowknife, NT and till samples were processed at Overburden Drilling Management Limited of Ottawa, ON.  

A $1,280,000 exploration budget for 2016 included data compilation work, airborne geophysical surveys and ground follow up work. Most recently, this past September a 3,020-line kilometer helicopter-borne magnetic/electromagnetic survey was completed.  Exploration plans for 2017 have not yet been determined.  Once a program has been decided upon by the joint venture and a budget announced North Arrow will decide on whether to participate or have its interest in the project diluted.

In order to focus spending on the drilling of two other properties North Arrow elected not to contribute its 45% share of costs to the 2016 program and Dominion elected to fund the full program and budget. As a result the Company expects its interest in the LDG joint venture has been diluted to approximately 39% (exact project expenditures not yet known).